Net Metering & Solar Panels

Interconnection & Net Metering
If you are planning to install a solar energy system or other qualified generating facility, this page provides the information, applications, and requirements needed to connect to the City of Truth or Consequences electric utility system. The City offers two interconnection application paths based on the size of your system. Before your system can operate, all required applications, inspections, and approvals must be completed and submitted to the City.

For questions, contact Planning & Zoning at (575) 894-6673 or the Electrical Department at (575) 740-8062.